Home
About
Company Profile
Corporate Culture
Honors
Product
Anaerobic reactor
Aeration equipment
Dissolved air flotation equipment
Filtering equipment
Sludge scraping equipment
Integrated wastewater treatment equipment
Dust removal, desulfurization and denitrification equipment
VOC odor treatment
Strength
Technical Strength
Environmental engineering design qualification
Engineering contracting qualification
High-tech enterprise
Case
Papermaking wastewater
Chemical fiber wastewater
Other industrial wastewater
High desalination water and reclaimed water reuse
Town sewage treatment
Beautiful countryside sewage
Dust removal, desulfurization, denitrification, and atmospheric governance
VOC volatile organic compound treatment
Garbage leachate treatment
Blog
Company News
Industry News
Contact
CN
Below is an introduction to the features and maintenance of integrated water treatment equipment
Below is an introduction to the characteristics and maintenance of integrated water treatment equipment. It has strong adaptability to water quality, good shock load resistance, stable effluent water quality, and no sludge expansion. The pond uses a new type of elastic three-dimensional filler with a large specific surface area, making it easy for microorganisms to form biofilms and easy for the biofilm to shed. Under the same organic matter load, it has a high removal rate of organic matter and can improve the solubility of oxygen in the air in water.
22
2021
/
10
Below is an explanation of the characteristics of integrated water treatment equipment
Below is an explanation of the characteristics of integrated water treatment equipment. Integrated water treatment equipment installation and sewage treatment equipment are industrial equipment that can effectively treat urban sewage and industrial wastewater, preventing sewage and pollutants from directly flowing into water bodies. It is of great significance to improving the ecological environment, enhancing the quality of urban life, and promoting economic development.
20
Common Anaerobic Tower Anomalies and Solutions (Part 2)
Anaerobic Tower Common Anomalies and Solutions (Part 2) Floc or loose "floc" particulate sludge forms and washes away Reason: Due to the action of acid-producing bacteria in the suspended solids in the feed, particulate sludge aggregates, and a large number of acid-producing bacteria are produced on the surface of the particles or in a suspended state, forming surface "fuzz" particles, with a large number of acid-producing bacteria attached to the surface of the particles. Solution: Remove suspended solids from the influent and increase the degree of pre-acidification of the wastewater. Reasons for the breakage and dispersion of granular sludge: Sudden changes in load or influent concentration in the anaerobic tower; sudden increase in the degree of pre-acidification, acid-producing bacteria in a state of starvation; or the presence of
18
Common Anomalies and Solutions in Anaerobic Towers (Part 1)
Anaerobic towers, with their high processing capacity, are frequently used to treat high-concentration organic wastewater and play a crucial role in the daily operation of wastewater treatment systems. During the operation of anaerobic towers, problems such as slow granular sludge growth, insufficient gas production, and sludge loss often occur. Today, we will discuss the causes and solutions for these abnormal phenomena. Slow granular sludge growth in anaerobic towers. Causes: Insufficient nutrients and trace elements; Excessive influent pre-acidification; Too low sludge load; Granular sludge washout; Solutions: Increase the concentration of nutrients and trace elements in the liquid; Reduce the degree of pre-acidification; Increase the reactor load.
16
Do you know the characteristics of buried integrated water treatment equipment?
Do you know the characteristics of buried integrated water treatment equipment? The equipment installation follows the relevant installation specifications for buried integrated sewage treatment equipment. The equipment civil engineering is constructed by a formal construction team. This equipment can use two installation methods: one is set above the paving, and the other is set below the paving. This project is set below the paving, and all other equipment is set below the paving.
15